216 Industrial Road
Location: Summerville, SC
Project Completion Date: November 2021
Total Project Value: $527,498.00
Project Size: 15,500 SF
Project Details:
This project included the demolition of an existing 150’x50′ metal building and furnishing and erecting a new 80’x100′ and an adjoining 50’x150′ pre-engineered metal buildings. The existing foundations were topped with a new 6” concrete slab on grade.
Each building received new overhead door framed openings, man doors, motorized louvers, and exhaust fans.
Please share or like us: