210 Industrial Road

Location: Summerville, SC
Project Completion Date: August 2019
Total Project Value: $249,835.00

Project Details:
This project includes the renovation of an existing 150’x50′ metal building and furnishing and erecting a new 80’x100′ Nucor pre-engineered metal building.

The 150’x50′ existing metal building will be selectively demolished down to the structural steel frame. Damaged or bent girts and purlins will be replaced with new and the building will receive new vinyl faced insulation in the walls and roof, new wall and roof panels, overhead door framed openings, man doors, motorized louvers, and exhaust fans.

The 80’x100′ will be a new Nucor pre-engineered metal building with a gable style roof system, overhead door framed openings, man doors, motorized louvers, and exhaust fans.